


Leading provider of General Contracting
Consulting Services and Project Management Solutions

Essential Part of the Power Generation Process
Automatic transfer switches with built-in controls will monitor your standard telecom power supply and detect any interruptions.
​
When the utility power does fail, the transfer switch automatically starts the on-site generator and transfers the electrical load once the proper voltage and frequency has been reached.
​
This is key for any kind of site relying on power to remain online 24/7.
Detection of any loss of power
Switch from utility to generator power
Electrical power when utility power fails
Full Protection During Power Loss
This process takes a matter of seconds after the power failure occurs. After the normal utility power has been restored, the transfer system will return the load back and after a time delay, shut down the generator.
​
With an automatic transfer switch, your telecom power equipment and business operations are protected 24 hours a day, seven days a week. Our team can provide full installation and testing services before and during delivery.